PROPERTY DETAIL
Software used
AutoCAD, Revit
Date
05 Apr, 2017
Area
60,000 Sq.m.
CINEMA
We have achieved a remarkable transformation in architectural visualization and project coordination with our latest project. We have moved away from using static graphics and traditional Computer-Aided Design (CAD) to using a dynamic Building Information Modeling (BIM) environment. We created an immersive BIM model of an outdoor architecture project by merging CAD drawings with high-quality photos. This has provided stakeholders with an unprecedented level of visualization for the proposed design and its contextual integration.
Advanced BIM software was utilized to create a seamless digital model of the building’s surroundings by combining realistic photos and CAD drawings. In order to accomplish this, the geometry data from the CAD drawings was integrated and superimposed with highly detailed imagery that captured the textures, lighting, materials, and landscaping aspects. The result is a dynamic BIM model that accurately depicts how the building interacts with its surroundings while also faithfully representing its architectural shape.
We have set a new standard for Exterior architectural visualization by using a creative CAD and image to BIM conversion technique. This method provides stakeholders with a better understanding of the project’s functional and aesthetic features, enabling them to make well-informed decisions. By utilizing BIM to its full potential, we have improved project coordination, communication, and collaboration, resulting in increased efficiency and success throughout the project. This presentation showcases our dedication to delivering exceptional results to our clients by pushing the boundaries of technology in architectural design and visualization.