Scroll Top

Comfort Victorvillet Hotel

Lorem ipsum dolor sit amet ipsum

PROPERTY DETAIL 

Software used
AutoCAD, Revit, Navisworks

Date
01 Apr, 2017

Area
20,000 Sq.m.

Comfort Victorvillet Hotel
We streamlined the process of converting shop drawings and red line markups into detailed HVAC models in a Building Information Modeling (BIM) environment. Our primary objective was to ensure precision and compliance with project requirements, while also facilitating effective communication and collaboration among stakeholders. To achieve this, we carefully analyzed red line markups, used advanced BIM technology, and paid close attention to detail, resulting in practical instructions for HVAC modeling and comprehensive shop drawings.
The first step of the procedure was carefully going over the red line markups that contractors and engineers had given for the project. These markups provided invaluable input and guidance for additions and changes to the building’s HVAC system. We converted these markups into targeted modeling activities, such as ducting layout alterations, equipment placements, sizing revisions, and coordination with other building systems, by utilizing sophisticated BIM software.
We created detailed shop drawings using the BIM environment, which accurately reflects the updated HVAC designs based on the red line markups. These shop drawings contained precise dimensions, annotations, material specifications, and installation instructions that were crucial for the construction and installation teams to successfully implement the HVAC systems. By incorporating red line markups directly into the BIM workflow, we reduced errors, sped up the production of precise shop drawings, and facilitated smooth communication. All of these factors ultimately improved project efficiency and quality.
× Contact Right Now!